Full text available in Adobe Acrobat format:
http://www.architectura.actapol.net/volume13/issue2/13_2_109.pdf
Issue 13 (2) 2014 pp. 109–120
Wiesław Buczkowski, Anna Szymczak-Graczyk
ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM
Keywords: demolition of column, load of structure, P-70 system
Abstract: In the work presented the concept and calculation for strength-associated with the need to remove a single column in a production, resulting from a change in technology. Reinforced concrete pillars were arranged at 6 m, and each pole there were a load of the two – bay of 12 m of lenghts. Remove the pole is designed in a way that guarantee is not undermined mended. Assumed that the demolition will not cause the displacement of any existing structure. In addition to the calculation for strength of technology, and works carried out monitoring work. In the final part of the posted photos showing the course of the implementation of the work.
For citation:
EndNote
BibTeX
RefMan
MLA | Buczkowski, Wiesław, and Anna Szymczak-Graczyk. "ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM." Acta Sci.Pol. Architectura 13.2 (2014): 109–120. |
APA | Buczkowski W. and Szymczak-Graczyk A. (2014). ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM. Acta Sci.Pol. Architectura, 13 (2), 109–120 |
ISO 690 | Buczkowski, Wiesław, Szymczak-Graczyk, Anna. ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM. Acta Sci.Pol. Architectura, 2014, 13.2: 109–120. |
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom13/zeszyt2/abstrakt-109.html
http://www.architectura.actapol.net/tom13/zeszyt2/abstrakt-109.html