Issue 13 (2) 2014 pp. 109–120

Wiesław Buczkowski, Anna Szymczak-Graczyk

ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM

Keywords: demolition of column, load of structure, P-70 system
Abstract: In the work presented the concept and calculation for strength-associated with the need to remove a single column in a production, resulting from a change in technology. Reinforced concrete pillars were arranged at 6 m, and each pole there were a load of the two – bay of 12 m of lenghts. Remove the pole is designed in a way that guarantee is not undermined mended. Assumed that the demolition will not cause the displacement of any existing structure. In addition to the calculation for strength of technology, and works carried out monitoring work. In the final part of the posted photos showing the course of the implementation of the work.
pub/13_2_109.pdf Full text available in Adobe Acrobat format:
http://www.architectura.actapol.net/volume13/issue2/13_2_109.pdf

For citation:

MLA Buczkowski, Wiesław, and Anna Szymczak-Graczyk. "ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM." Acta Sci.Pol. Architectura 13.2 (2014): 109–120.
APA Buczkowski W. and Szymczak-Graczyk A. (2014). ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM. Acta Sci.Pol. Architectura, 13 (2), 109–120
ISO 690 Buczkowski, Wiesław, Szymczak-Graczyk, Anna. ISSUES THAT OCCUR WITH LIQUIDATION OF PIPES IN THE PRODUCTION DESIGN OF THE REINFORCED CONCRETE BEAM OF P-70 SYSTEM. Acta Sci.Pol. Architectura, 2014, 13.2: 109–120.
EndNote BibTeX RefMan
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom13/zeszyt2/abstrakt-109.html