Zdzisław Hejducki, Łukasz Łodożyński

Faculty of Civil Engineering, Wrocław University of Science and Technology, Wrocław

Scheduling construction works with established workforce cost budget

Keywords: time-cost optimization, organization of construction works, task scheduling, optimization problems
Abstract:

The problem presented in the article consists in optimizing the work teams working schedule at the given
construction process budget. The maximum working time of particular working groups will be determined
while carrying out construction works in order to fit in the fixed amount of wages. This issue was solved with
regard to the limitations of the flow system – time coupling method ensuring continuity of works (TCM I).
To solve the problem, a computational algorithm using matrix modelling and artificial intelligence for scheduling
tasks was developed. An example from construction practice is presented which is a verification of the
proposed calculation method. The work is part of the issue of time and cost analysis in optimal scheduling of
construction processes.

pub/18_2_3.pdf Full text available in Adobe Acrobat format:
http://www.architectura.actapol.net/volume18/issue2/18_2_3.pdf

For citation:

MLA Hejducki, Zdzisław, and Łukasz Łodożyński. "Scheduling construction works with established workforce cost budget." Acta Sci.Pol. Architectura 18.2 (2019): 3-10.
APA Hejducki Z. and Łodożyński Ł. (2019). Scheduling construction works with established workforce cost budget. Acta Sci.Pol. Architectura, 18 (2), 3-10
ISO 690 Hejducki, Zdzisław, Łodożyński, Łukasz. Scheduling construction works with established workforce cost budget. Acta Sci.Pol. Architectura, 2019, 18.2: 3-10.
EndNote BibTeX RefMan
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom18/zeszyt2/abstrakt-3.html